Skip to content
    Case Study

    How Chevron increased scheduling efficiency and created a single trusted system

    This successful energy provider, producing 1.15 million barrels of oil & liquid gas per day, showed how important it is to have accurate data, efficient processes, and connected systems in place. They improved the way they manage assets, increased efficiency, and built one reliable source of truth in SAP S/4HANA. Now, scheduling tasks that once took four days can be done in just one, helping teams make better decisions faster.

    Products Used

    75%

    reduction in scheduling process time

    accent stroke

    1 Integrated System

    by consolidating four disconnected ERP systems

    accent stroke

    Team fully embraced tools

    significantly improving efficiency and data accuracy

    accent stroke

    Challenge

    Chevron recognized the importance of digital transformation in enterprise asset management but initially struggled due to a lack of input from maintenance end users. Their key challenges included: 

    • Disconnected Systems: Multiple legacy ERP systems prevented seamless data integration and created inefficiencies.
    • Inefficient Planning & Scheduling: Teams relied on manual spreadsheets to manage maintenance schedules, leading to time-consuming and error-prone processes. 
    • Limited SAP S/4HANA Scheduling Capabilities: After migrating to SAP S/4HANA, Chevron found its native scheduling tools inadequate for their complex needs. 
    • Inconsistent Asset Master Data: Varying data structures across global sites hindered efficiency, safety, and decision-making. 
    • Integration Challenges: Connecting essential tools like asset performance management solutions remained difficult. 

    Solutions

    To address these challenges, Chevron launched the FIRM (Facilities Integrity Reliability Management) group to drive transparency and consistency in asset management. They implemented: 

    • Prometheus SAP Master Data Governance (MDG): Standardized enterprise-wide data with structured approval workflows, ensuring consistency and accuracy.
    • Prometheus Planning & Scheduling: Provided advanced scheduling capabilities, including weighted priority scheduling and shift management, while seamlessly integrating with SAP.
    • Prometheus Reporting & Analytics: Delivered real-time insights into maintenance and reliability performance, improving data-driven decision-making. 

    Results

    Despite initial resistance to change, within a year of implementing SAP S/4HANA and Prometheus solutions, Chevron’s teams fully embraced the tools. Key outcomes included: 

    • Faster, More Accurate Decision-Making: Reliable master data enabled informed and efficient decision-making across teams.
    • Drastically Reduced Scheduling Time: The scheduling process, which previously took four days, was completed in less than one day. 
    • A Single Source of Truth: SAP S/4HANA, integrated with Prometheus tools, became the authoritative system for asset management. 
    • Optimized Maintenance Planning & Execution: Improved processes resulted in greater reliability, efficiency, and safety across global operations. 

    See it in action