Industry: Nuclear

Susquehanna Nuclear Drastically Reduces Costs and Duration of Outages with Syntempo

Susquehanna Nuclear achieves a 13% improvement in outage duration, 50% reduction in OCC/MOCC meetings, and enables real-time data access/updates in the field.

Industry: Nuclear

Susquehanna Nuclear Drastically Reduces Costs and Duration of Outages with Syntempo

Susquehanna Nuclear achieves a 13% improvement in outage duration, 50% reduction in OCC/MOCC meetings, and enables real-time data access/updates in the field.

Download

Similar Resources

Case Study

Modernizing the Workforce with the Prometheus Platform

Case Study

Susquehanna Nuclear Reduces Costs and Duration of Outages

Case Study

NCOC Completes Historic First Turnaround
Offices
Headquarters - Raleigh, NC
4601 Six Forks Rd Ste 220
Raleigh, NC 27609
Phone: +1 (888) 317-2397
San Antonio, TX
18880 Stone Oak Pkwy
San Antonio, TX 78258
Phone: (210)-201-8189
Gateshead, UK
Baltic Place, S Shore Rd. Gateshead
NE8 3AE, United Kingdom
Phone: +44 191 201 7777
Leeds, UK
1 York Pl, Leeds
LS1 2DR, United Kingdom
Phone: +44 113 827 0080
Melbourne, AU
16 Kirk St, Moe VIC
3825, Australia
Phone: +61 3 5132 2600
Brisbane, AU
8A/36 Agnes St, Fortitude Valley
QLD 4006, Australia
Phone: +61 7 3188 5264
Hamilton, CA
50 Dundas St E, Dundas, ON
L9H 7K6, Canada
Phone: +1 905-544-4144
Dordrecht, NL
Burgemeester de Raadtsingel 67, 3311 JG
Dordrecht, Netherlands
Phone: +31 78 614 6288
Kerkrade, NL
Eurode-Park 1, Kerkrade, Limburg 6461
KB, Netherlands
Phone: +31 78 614 6288
São Paulo, BZ
R. Olimpíadas, 205, 4. Andar
Vila Olimpia, São Paulo, SP, CEP 04551-000
Phone: +55 11 3728-9372
Pretoria, SA
1 Pegasus Building 210 Amarand Ave
Waterkloof Glen, Pretoria, 0181
South Africa
Phone: +27 12 003 2916