Industry: Shipping and Logistics

BTP Improves Maintenance Processes with Prometheus Solutions

Learn how BTP reduced the number of ship to shore gantry cranes down at a time from 2.5 per day to 1, increases equipment uptime, and reduced backlog.

Download

Case Study

Susquehanna Nuclear Drastically Reduces Costs and Duration of Outages with STO Execution

Case Study

Gunvor Group Gains Turnaround Transparency with Roser Suite from Prometheus Group