Why Scheduling Tools Without SAP/ERP Integration Are Hurting Your Organization

Why Scheduling Tools Without SAP/ERP Integration Are Hurting Your Organization

When a problem occurs or equipment breaks, the standard procedure in most companies is to create a notification and enter it into SAP. However, some companies find planning and scheduling work orders in SAP to be confusing and time consuming. This leads to companies exporting data into a third-party program like Excel or MS Project to plan and schedule work. Exporting this data means that it now takes days or weeks for the data to be input back into SAP,  which limits visibility and greatly increases the risk of inaccurate data. 

So what happens if a schedule needs to change and the data is stuck in Excel? How does your procurement team know that you need the material two days earlier? Is the storeroom aware they need to pull the material by a certain date? Does your services contractor know they need to be on-site on a different day? If your planning and scheduling tool does not adequately address these questions, then not only could you fall behind in work, but your operations’ metrics may suffer or be inaccurate. Taking data out of SAP results in:

  • Increased downtime because teams are out of the loop on planned work, particularly if any changes occur
  • Increased reactive work, which increases costs for maintenance, repair, and operations (MRO) due to expedited shipping to get unplanned material on-site and overtime to get the work completed
  • Decreased wrench time due to planning and scheduling inefficiencies and an overall lack of visibility between departments

While many companies use SAP to manage routine plant maintenance, they often turn to external systems to handle big projects and shutdowns. Many shutdown specialists have been using third-party project management tools long before an integrated SAP R/3 system existed. This longtime reliance on an existing practice can make people reluctant to experiment with new solutions or technology.

Part of the resistance to keep projects inside SAP is that organizations tend to outsource shutdown projects to outside contractors who have their own solutions. Another factor is that some shutdown specialists are not aware of the work management capabilities of SAP and that integrated SAP solutions are available. There is also a general belief that these augmented solutions are not built for the huge volume of detailed planning and scheduling data that goes along with a massive project or shutdown.

However. these assumptions are incorrect  and hurt your organization from not only a data integrity perspective, but they also reduce efficiency and your ability to follow best practices.

Similar Posts

Offices
Company Headquarters
4601 Six Forks Rd Ste 220
Raleigh, NC 27609
Phone: +1 (888) 317-2397
Raleigh, NC
4601 Six Forks Rd Ste 220
Raleigh, NC 27609
Phone: +1 (888) 317-2397
San Antonio, TX
18880 Stone Oak Pkwy
San Antonio, TX 78258
Phone: (210)-201-8189
Gateshead, UK
Baltic Place, S Shore Rd, Gateshead
NE8 3AE, United Kingdom
Phone: +44 191 201 7777
Leeds, UK
1 York Pl, Leeds
LS1 2DR, United Kingdom
Phone: +44 113 827 0080
Melbourne, AU
16 Kirk St, Moe VIC
3825, Australia
Phone: +61 3 5132 2600
Brisbane, AU
8A/36 Agnes St, Fortitude Valley
QLD 4006, Australia
Phone: +61 7 3102 3877
Hamilton, CA
50 Dundas St E, Dundas, ON
L9H 7K6, Canada
Phone: +1 905-544-4144
Dordrecht, NL
Burgemeester de Raadtsingel 67, 3311 JG
Dordrecht, Netherlands
Phone: +31 78 614 6288
Kerkrade, NL
Eurode-Park 1,Kerkrade, Limburg 6461
KB, Netherlands
Phone: +31 78 614 6288
São Paulo, BR
R.Olimpíadas, 205, 4. Andar
São Paulo, SP, CEP 04551-000
Phone: +55 553 728-9372
Pretoria, SA
1 Pegasus Building 210 Amarand Ave
Waterkloof Glen, Pretoria, 0181
South Africa
Phone: +27 12 003 2916